Wednesday, November 04, 2015

Combining two flawed subsidy programs won’t build FTTP infrastructure

Fellow blogger Steve Blum of Tellus Venture Associates suggests coordinating the U.S Federal Communications Commission’s Connect America Fund (CAF) Internet telecom infrastructure construction subsidies with a state subsidy program administered by the California Public Utilities Commission to multiply the amount of money available for such projects. (See Blum's blog post here)

Combining two fundamentally flawed subsidy programs, however, won’t produce a beneficial result considering the underlying weakness of both. Each is primarily structured to subsidize bandwidth, not infrastructure. They do so by defining subsidy eligible areas based on existing low bandwidth levels supported and delivered by legacy infrastructure rather than subsidizing the construction of modern fiber to the premise (FTTP) infrastructure in high cost areas. If an incumbent provider is providing that minimum bandwidth level, the area is deemed ineligible. That furthers the goal of the legacy telephone and cable companies to preserve the status quo by making it more difficult for others to finance FTTP builds in their service territories.

This is a key shortcoming because the primary problem in California and the nation is outdated and inadequate telecom infrastructure that needs to be replaced with FTTP infrastructure. Also, incumbent local exchange carriers (ILECs) are not motivated to construct FTTP infrastructure in high cost areas regardless of the availability of subsidies. Their business strategy is to focus on more profitable mobile wireless services and on cherry picking high end private communities and parts of low cost, urbanized areas for very limited FTTP builds.

Friday, August 28, 2015

AT&T to deploy "wireless local loop" fixed premise service in high cost areas

AT&T will apparently use wireless technology to provide fixed premise Internet telecommunications services using funding from the Connect America Fund (CAF) to subsidize infrastructure costs in high cost areas of the nation. The U.S. Federal Communications Commission announced this week that AT&T accepted $428 million in annual subsidies from the CAF to serve 2.2 million rural consumers in 18 states. Since the FCC requires CAF recipients to provide connectivity of "at least" 10Mbps for downloads and 1Mbps for uploads, the wireless gambit could potentially meet that standard. AT&T's wireless strategy was communicated to the FCC in a letter dated August 27, 2015 (H/T to California-based Steve Blum of Tellus Venture Associates):

We anticipate meeting our CAF Phase II obligations through a mix of network technologies, including through the deployment of advanced wireless technologies on new wireless towers that will be constructed in previously unserved areas. We will diligently pursue the necessary tower siting and permitting processes so that these new towers can be completed in a timely manner.

As previously mentioned in this space, the so-called "wireless local loop" (WLL) infrastructure strategy proffered in 2014 as part of AT&T's proposed takeover of DirecTV will also help AT&T meet its universal service obligations under the FCC's recently adopted Open Internet regulatory scheme classifying Internet as a common carrier telecommunications service. The strategy will also provide alternative premise service delivery infrastructure as AT&T retires its legacy copper cable outside plant.

The upshot for AT&T customers: Those that were never offered DSL service when AT&T rolled it out more than a decade ago might now see premise service roughly equivalent to DSL sometime in the next five years while those outside the very limited range of its U-Verse triple play DSL-based service could find themselves switched from legacy DSL to WLL.

An unresolved problem, however, is as Internet bandwidth demand continues its inexorable rapid rise, the WLL technology will be obsolete as soon as it's deployed and falls short of the FCC's current minimum benchmark for Internet service of 25Mbps down and 3Mbps up adopted earlier this year.

Wednesday, December 17, 2014

Story on CAF subsidies encapsulates much of what's wrong with U.S. telecom policy

This story on the U.S. Federal Communications Commission's high cost infrastructure subsidy program, the Connect America Fund (CAF), encapsulates much of what's wrong with U.S. telecommunications policy.

CAF subsidizes technologically obsolete copper cable designed to serve a pre-Internet telecommunications system. Not only that, the telecom companies that would benefit from the CAF subsidies aren't grateful to get them and immediately put them to work. Instead, they bitch and moan as CenturyLink and Windstream do here.

Pathetic. It's no wonder other nations look at U.S. telecom policy and shake their heads.

Friday, September 05, 2014

FCC chair signals end of “broadband” era and rise of FTTP

Sooner or later – more likely sooner – the Federal Communications Commission (FCC) will recognize the irrelevance and futility of defining and subsidizing landline premise telecommunications infrastructure based on specified “broadband” download and upload speeds as Internet bandwidth demand growth tracks Moore’s Law for microprocessor processing power, doubling every 18-24 months.
Consequently, it will likely repurpose the mission of the FCC’s Connect America Fund (CAF) program created to subsidize infrastructure construction in high cost areas to instead help defray the cost of deploying fiber to the premise (FTTP) infrastructure in these areas. At the same time, the FCC could also realize that significantly greater funding will be needed to do the job than the $9 billion the CAF has budgeted for its second phase covering the period 2014-2019.

The FCC this year recognized that its current eligibility criterion for CAF subsidies is potentially outdated. It’s targeted to high cost areas where premises are not served by landline connections providing at least 4 Mbs down and 1 Mbs up. The FCC issued a notice of inquiry in August to take testimony as to whether that standard should be increased and modified to include latency as well as speed.

In prepared remarks delivered this week, FCC Chairman Tom Wheeler suggested 25 Mbs should be considered the new minimum. He went on to observe that might also be too low and only a quarter of the throughput that Americans presently expect given their growing appetites for high definition streaming video and multiple connected devices in their homes and small businesses.

“Today, a majority of American homes have access to 100 Mbs,” Wheeler continued. “It is that kind of bandwidth that we should be pointing to as we move further into the 21st century. And while it’s good that a majority of American homes have access to 100 Mbs, it is not acceptable that more than 40 percent do not.”

Relative to high cost areas, Wheeler noted the FCC “will continue to establish requirements for our universal service programs, but beyond that, consumers are establishing their own expectations.” That recognition of end user needs represents a significant departure from existing policy where telecommunications providers and governments tell consumers in these areas what they should expect instead of the reverse. It’s also an implicit recognition that there should be a single standard and not a separate and lesser standard for high cost areas of the nation. Which makes sense given that core content providers and other services are tailored for a single standard of quality at the network edge.

Noting FTTP deployments in several metro areas of the U.S., Wheeler impliedly recognized FTTP infrastructure is replacing the speed-based “broadband” metal wire paradigm of the legacy telephone and cable companies. That model utilizes “bandwidth by the bucket,” speed-based pricing tiers based on the assumption that metal wire infrastructure has limited carrying capacity and that service must accordingly be rationed and priced based on demand.

Wheeler recognized with FTTP, that pricing model that irks many consumers faces obsolescence. “Once fiber is in place, its beauty is that throughput increases are largely a matter of upgrading the electronics at both ends, something that costs much less than laying new connections,” Wheeler said.

Wheeler also acknowledged that mobile wireless services cannot substitute for FTTP. “While LTE and LTE-A offer new potential, consumers have yet to see how these technologies will be used to offer fixed wireless service,” he said.

Thursday, May 23, 2013

FCC Expands CAF Definition of Broadband Subsidy-Eligible Areas - 2013-05-22 22:48:29 | Broadcasting & Cable

FCC Expands CAF Definition of Broadband Subsidy-Eligible Areas - 2013-05-22 22:48:29 | Broadcasting & Cable

Summed up, this subsidy program designed to underwrite the cost of building telecommunications infrastructure in high cost areas is ineffective.  Telcos won't apply because they don't want to fully serve these areas and complain the subsidy amounts are too low.  And even if they did want the money, they have to fight cable companies ineligible for the funding (derived from a surcharge on telephone bills) that claim the telcos are upgrading their infrastructures in order to steal their customers.

This circumstance only adds to the argument that communities and particularly those with lower population densities can't expect legacy providers to serve them.  They must build their own publicly and cooperative owned and operated fiber networks.

Saturday, July 28, 2012

Verizon, AT&T Decline Broadband Connect America Funding

Verizon, AT&T Decline Broadband Connect America Funding: Two of those carriers – AT&T and Verizon – yesterday declined all of the funding they had been offered. In a letter to the FCC shared with Telecompetitor, AT&T — which was offered $47.8 million — said it is “optimistic” about its ability to get more broadband into rural areas, “particularly as the technology continues to advance.” But the company said it could not commit to participate in the program until it finalizes that strategy.

One year ago, the big incumbent telcos urged the FCC to reform the Universal Service Fund with standards that would effectively subsidize deployment of first generation DSL service introduced more than a decade ago.  Now that the USF has been reformed into the Connect America Fund along the lines of what they wanted, they're saying thanks but no thanks to the subsidies.  Most likely because the legacy DSL standards the telcos proposed last year were already outdated by a decade or more -- and now look even more obsolete and unable to keep up with burgeoning bandwidth needs.

Wednesday, November 02, 2011

Cable emerges as dominant commercial ISP

As the Internet becomes the all purpose global telecommunications medium delivering voice, video, the web and email, cable companies have emerged as the dominant Internet Service Provider (ISP).

As Susan P. Crawford explains in this Harvard Law & Policy Review article The Communications Crisis in America, compared to incumbent telcos and wireless and satellite ISPs, only cable offers sufficiently robust bandwidth and headroom going forward. Telcos can't keep up since they would incur unabsorbable costs to replace their obsolete copper cable plants with fiber -- costs that would also make their generous stock dividends obsolete.

That's not likely to change despite the Federal Communications Commission's recent reforming of the Universal Service Fund (USF) from subsidizing plain old telephone service (POTS) in high cost areas to Internet. The Connect America Fund (CAF) requires telcos merely provide first generation DSL-level connectivity of 4Mbs for downloads and 1Mbs up and allocates only $4.5 billion a year -- hardly enough to meaningfully offset the cost of changing out decades-old copper plant for fiber.

In the wireless realm, the physics of radio spectrum hamstring wireless ISPs while satellite Internet -- on the verge of obsolescence from the day it was introduced -- has clearly reached its expiration date.

With cable now the dominant commercial Internet provider for most Americans, Crawford argues for increased government scrutiny of its monopoly market power. Crawford's position may draw support from community networks that have gone up against cable companies that pull out all the political stops to preserve their monopolies. The cable guys don't always win as Longmont, Colorado showed this week and as reported by Christopher Mitchell of Community Broadband Networks. Community networks also have a technological carrying capacity edge over the hybrid coax/fiber cable plant employed by cable companies since they typically deploy full fiber to the premises networks.

Thursday, October 13, 2011

Community networks should be eligible for CAF subsidies

U.S. Federal Communications Commission (FCC) is about to release details of its Connect America Fund (CAF) that will reform the current Universal Service Fund that subsidizes switched voice service to instead subsidize Internet connectivity in high cost areas.

The FCC faces a significant challenge in how it defines those areas eligible for CAF subsidies given that wireline Internet access is highly granular. Incumbent investor-owned cable and telephone companies parse their service areas very tightly when it comes to determining what is and what isn't a high cost area for providing Internet service. A given home or business may have access while another just down the road or street is deemed too costly to serve and is relegated to dialup or satellite. These premises can't be described as situated in remote, isolated areas since they are almost on top of areas that have wireline Internet access.

Targeting CAF subsidies to the most remote regions of the United States won't help these folks. They comprise many of the 24 million Americans that FCC Chairman Julius Genachowski noted in a February 7, 2011 speech "couldn’t get broadband today even if they wanted it. The infrastructure simply isn’t there." It's there for their neighbors -- but not for them.

Many communities have responded to this widespread problem by building their own fiber to the premises networks to fill in the gaps. These networks must necessarily overlap the footprints of the incumbent's incomplete, Swiss cheese infrastructures since telecommunications infrastructure like other utilities must cover sufficiently large geographical areas in order to be economically viable. The FCC should designate these community networks as eligible for CAF subsidies if they meet certain requirements such as providing voice and 911 emergency service at standards that meet or exceed those placed on existing wireline providers.